Raw industrial warehouse slab awaiting preparation

Tier 5 Trade

Concrete prep, supplied and installed. Rate card on the page.

Grinding, shot-blasting, chemical strip, substrate repair. First-job-cash terms. Net-7 or net-14 with established trade partners.

  • Rates published
  • Net-7 or net-14
  • 10-day scheduling
  • SWMS for our work

Tier 5 rate card. All-in pricing.

Labour, equipment, and consumables. One line, one price. Minimum job is 50 sqm. Jobs scheduled within 10 business days of portal submission.

Prep

Concrete prep services
ServiceSize bandRateNotes
Concrete grind, light (one pass)50 to 200 sqm$24 / sqmVacuum and tack included
Concrete grind, heavy (multi-pass)50 to 150 sqm$34 / sqmOld sealer or paint removal
Shot-blast prep100 to 500 sqm$28 / sqmIndustrial, heavy contamination
Chemical strip50 to 200 sqm$26 / sqmHeritage or delicate substrates
Substrate repair (cracks)Per linear metre$45 / lmQuoted on site
Substrate repair (spalls)Per square metre$65 / sqmQuoted on site
Moisture remediation50 to 500 sqm$22 / sqmSubstrate sealing or drainage prep

Coating install (labour)

Coating install rates, labour only
ServiceSize bandRateNotes
Two-coat epoxy install50 to 300 sqm$58 / sqmLabour only, you supply epoxy
Polyaspartic install50 to 300 sqm$72 / sqmLabour only, you supply coating
Polished concrete50 to 300 sqm$98 / sqmMechanical hone and seal

Supply (cost-plus pricing)

Materials and consumables
ItemUnitPriceNotes
Two-pack epoxy, residential gradePer litre$32 / L10L kit minimum
Two-pack epoxy, commercial gradePer litre$48 / L20L kit minimum
Polyaspartic topcoatPer litre$65 / L5L kit minimum
Decorative flake (per kg)Per kg$22 / kgStandard or custom blends

Payment terms, plain English.

New trade partners run first-job-cash. Established partners with a payment record run net-7 or net-14. Bill reviews every application personally.

Stage one

First job cash

Invoice on the day of completion. Payment cleared before we book the second job. Builds the credit relationship.

Stage two

Net 7

Invoice on completion, payable in seven days. Available after one completed job paid on time.

Stage three

Net 14

Invoice on completion, payable in fourteen days. Available to trade partners with three or more on-time payments.

5 percent late fee on net-7 or net-14 accounts overdue by seven days. Disputes raised within seven days of completion with photo evidence will be re-inspected and made good. Trade portal access is sent by Bill or Dave manually after we approve your application. There is no public self-service login.

Apply

Apply for a Floorscape trade account.

ABN, trade licence, and your preferred payment terms. We respond within one business day. If approved, Bill emails the credentials and the first job slot.

Preferred payment terms