
South-East Corridor
Flooring in Clyde.
Clyde is a new-build suburb, and a fresh slab is a different problem to a 20-year-old garage. Concrete out-gasses for 12 to 18 months after the pour, and the wrong epoxy system on a green slab fails inside a year. Floorscape uses an Ardex-spec system designed for fresh concrete, with prep that handles moisture vapour the way the manufacturer expects.
- Postcode 3978
- South-East Corridor
- Same-day install
- 5-year workmanship warranty
- Fixed price quotes
Quote
Ready to book your Clyde garage?
Tell us the size, finish, and slab condition. We mint a fixed price in QuoteMachine and email it through. No payment processor on this form, the deposit is collected later through Xero.
Why Floorscape works in Clyde
New-build country runs on a different clock. Fresh slabs, builder programmes, owners moving in next month. We coat to that timing.
New-build specialist
Fresh concrete out-gasses for 12 to 18 months. We use an Ardex-spec system rated for green slabs, with prep that respects the manufacturer warranty.
Builder programmes
Working alongside Metricon, Henley, Simonds, Boutique Homes, and Burbank. We schedule between handover and move-in week.
Sale-ready warranty
A manufacturer system warranty plus a Floorscape workmanship warranty that holds at sale time. Buyers can verify the product cover independently.
Clyde questions, answered.
We prefer 28 days minimum, with a moisture test before any coating goes down. If the reading is high we recommend a moisture-tolerant primer rather than waiting another month.
Yes. We coat in handover-ready new builds across Casey and Cardinia. We coordinate access through your site supervisor and leave the garage clean for the final inspection.
Classic from $1,800. Premium from $3,200. Showroom from $5,500. Fixed price after a free site check, no padding for travel inside our Melbourne service area.
Most residential garages are a one-day install. Walk on it the next morning, drive on it after 72 hours. We confirm timing in writing before we start.
A written 5-year workmanship warranty on top of the manufacturer system warranty. Terms in plain English at /warranty, no fine print buried.
Three tiers. One day on site. Prices on the page.
Classic, Premium, Showroom. Same engineered prep underneath each one. See what fits the Clyde brief.